Now I have a rough spare 230 block I want to start experimenting with gasflow... though this will rely on my nephew being able to make time available to do it.
I'm considering that the 'transition area' is basically a part of a port which has a valve mid-way, so it becomes an important part of the detailing for port work.
Any ideas?