After getting an after market alt, p/s & a/c bracket for my 292 project, I had an issue with it being in the way of my bypass plumbing. I asked here if anyone sold these and CNC Dude said he could make one. This thing is beautiful, Scott does wonderful work!
I just have it temped on right now to check fit, so never mind the all-thread I have holding it on. I'll need to find some correct length bolts for permanent mounting.
You know, I am always in awe of folks who have mastered a craft as well as cnc dude has because as much as I try, I don't have the eye and spacial ability necessary to really work at that level. It's really impressive my friend.