Working on the next group of heads. There are 3 more on another stand. Need a longer set of rails to work up these heads.
First step is cleaning
2nd Mag the decks and chambers for cracks
3 pressure check
4 mark each head for problems ( ie bad bolt holes ect)
5 install guides
6 machine for positive seals
7 machine exh seats
8 machine intake and exh seat (roughed)
9 unshroud valve bowls, port, cut bolt boss for lumps
10 install lumps
11 final valve job
12 deck intake/ exh flange and deck of head
13 final clean
14 assemble
Sometimes there are more steps, it just depends on the head.

Ran into one that was severely overheated. No telling how deep those cracks are.

EDIT does anybody really read these updates?

[Linked Image][Linked Image][Linked Image][Linked Image]
Attached Images