Nice work Larry. That 194 chamber looks like a runner!
Here is what is going on late this afternoon here at 12Bolt.
Step 2 of shop expansion. Step 1 was prepping a site for a storage building. Step 2 , Acquire the building. 52x96 14 side walls. Many steps to go. The shop expansion is taking place in the old building. Needed storage area for the engines/ parts.

[Linked Image][Linked Image][Linked Image]


Inliner Member 1716
65 Chevelle Wagon and 41 Hudson Pickup
Information and parts www.12bolt.com