Stage 2 of shop expansion is taking place. We moved core engines and parts over to the new building. Also the Blaster and Bake oven. This allowed the area for expansion to get ready for concrete work. As of today, the concrete is in. We had to dig out 8" of gravel and dirt to prepare the floor for concrete. 2" of insulation and then the radiant floor tubing. Concrete is 6" thick. Area is 24x42 and 14 tall