OK, I got the photo bucket dealie figured out today... I hope the next time I post, I can remember the drill... I'm hoping to
test fire the engine in the next week... I got the rear driveshaft back yesterday... I had it shortened 8" to allow for
the new drive train length... Monday the front drive shaft should
be ready... Looks like both crossmembers that go under the trans
will need some clearancing. I'm looking forward to a test drive.
Then I will move on to the axle change out..1st the rear, a Dana
53 and then the front (Dana 25). And just a reminder....I do not plan to hop-up the engine...I don't want to put unnecessary strain on the cooling or drive train...I'm hoping the Rambler
radiator, T5 trans and little, old Dana axles will be cool with a 258 and a Weber carb...